Terminal A Rail Stations
More detail
Site Utilities:
Scope included furnishing & installing site utilities, all components required for relocating power and communications to the traffic signals at the southeast end of the rail station and all components of work associated with relocating four (4) traffic control lighting.
Earthwork & Grading:
Scope included demolition, site preparation, excavation, backfilling, grading, stabilization, and subgrade.
Awnings & Canopies:
Scope included furnishing and installing the Awning and Canopy structure and fabric. PMC was also responsible for the design and engineering.